When a building sells, the money doesn't go to the owner first. It goes to a line of people standing in front of him, in an order that was written years earlier, when the deal was put together. That line is the capital stack, and every deal I have ever looked at has one, whether the seller drew it on a slide or not.
The stack is four layers, in order of who gets paid first. At the bottom, or first in line, is senior debt: the first mortgage. It is usually the biggest piece, roughly half to three quarters of the deal, and it is the cheapest money in the stack because it is the safest. The lender holds a first lien on the property itself, gets paid before anyone else out of the cash flow, and gets paid first out of the sale proceeds. Cheap money is not generous money. It is money that knows it is first in line.
Above the senior loan sits mezzanine debt, the piece that fills the gap between what the first mortgage covers and what the buyer can put in as cash. Mezzanine is usually around 10 to 20 percent of the stack, and it costs a lot more than the senior loan, commonly in the 11 to 16 percent range. The reason is simple: it is not secured by the property. It is secured by a pledge of the ownership interests in the entity that owns the property. If the deal goes bad, the mezzanine lender cannot foreclose on the building the way the first mortgage lender can. What it can do, under the intercreditor agreement between the two lenders, is take over the ownership interests, usually through a UCC sale, which can move faster than a foreclosure.
Above mezzanine sits preferred equity. This is a hybrid: it is ownership, not a loan, but it comes with a contractual preferred return, and it gets paid before common equity. It is typically another 10 to 20 percent of the stack. At the top, last in line, is common equity. That is the sponsor's money and the money of the investors alongside him. Common equity takes the first loss, gets paid last, and keeps whatever is left after everyone else has been paid. It also has the biggest upside, which is the trade.
Here is why I care about this when I underwrite. A deal can look fine on net operating income and still leave the top of the stack with nothing. If the sale price comes in short of the total debt, common equity gets wiped out first, then preferred, then mezzanine starts sweating. The senior lender is the last one to worry. So before I put money into a deal, I read the stack from the bottom up and ask one question at each layer: if this goes sideways, who gets hurt first, and is that me?
There is one practical check I run on any stack that has more than one layer of debt. Lenders look at the debt service coverage ratio on the combined debt, senior plus mezzanine, and they generally want to see it around 1.20. That means the property's income covers all the debt payments with about 20 percent to spare. If a deal only works because the mezzanine piece was left out of the coverage math, it does not work. Run the whole stack, or do not run it at all.
The capital stack is not complicated once you stop treating it like finance jargon. It is a line of people waiting to be paid, and your place in that line is the whole deal. Get paid first and you sleep well for a small return. Get paid last and you either earn the upside or you learn what first loss feels like. Either way, know where you stand before you sign, because the line does not move after closing.
← All insights